Project Overview

The submitted project record covers scheduled supply of 0.6/1kV to 10kV flame-retardant armoured cables for urban distribution-network construction. The framework format required stable production planning, repeatable batch inspection and coordinated technical documentation across multiple delivery windows.

Request a Similar Solution
ApplicationMunicipal distribution network
Cable scope0.6/1kV to 10kV armoured cable
Delivery modelScheduled batch supply
01

Project Requirements

  • Maintain consistent cable construction and electrical performance across recurring batches.
  • Coordinate production and dispatch against quarterly project demand.
  • Provide traceable batch records for inspection and handover.
  • Support field teams with laying and acceptance documentation.
02

STAECORE Solution

  • Planned medium-voltage production windows around the framework delivery schedule.
  • Applied conductor-resistance, partial-discharge and voltage-withstand checks according to the applicable product specification.
  • Prepared batch-specific inspection records and technical submittals.
  • Coordinated cable and distribution-board surge-protection requirements during project review.
03

Supplied Product Scope

0.6/1kV ZC flame-retardant YJV cable10kV armoured YJV power cableDistribution-board surge protection
04

Project Outcomes

  • Structured supply planning for a multi-stage urban network programme.
  • Unified product and inspection documentation across delivery batches.
  • A reusable cable-selection reference for municipal distribution projects.